Market Sector:- Leisure
![]() |
Client Main Contractor Design Consultant Project Value - £380 Million Sub-Contract Value - £3 Million Sub-Contract Programme – 12 months |
Project Description
Manufacture, Supply and installation of ductwork for 58 No. AHU Plantrooms to the new Olympic Media Centre.
Scope of Services
ASM were contracted to provide supply and extract systems to the studios for the Olympic Broadcasting systems. The work was carried out to a tight programme on site, it required considerable planning and control for the manufacture and delivery of the ductwork as no materials could be stored at site.
At its peak the site was receiving up to five 40ft articulated lorries of duct each day. The offloading and distribution of the ductwork was carried out using a third party logistics contractor.