Project:- Olympic Media Centre

Market Sector:- Leisure

Royal Festival Hall  

Client
Olympic Delivery Authority

Main Contractor
Skanska Rasheligh Weatherfoil

Design Consultant
Atkins

Project Value - £380 Million

Sub-Contract Value - £3 Million

Sub-Contract Programme – 12 months

Project Description

Manufacture, Supply and installation of ductwork for 58 No. AHU Plantrooms to the new Olympic Media Centre.

Scope of Services

ASM were contracted to provide supply and extract systems to the studios for the Olympic Broadcasting systems. The work was carried out to a tight programme on site, it required considerable planning and control for the manufacture and delivery of the ductwork as no materials could be stored at site.

At its peak the site was receiving up to five 40ft articulated lorries of duct each day. The offloading and distribution of the ductwork was carried out using a third party logistics contractor.

download as pdf

ASM Engineering Ltd - 74 Wilbury Way - Hitchin - Hertfordshire - SG4 0TP
Tel: 01462 477360 - Fax: 01462 477361 - E-mail: sales@asmeng.co.uk
Airport Ductwork Contractors - Airside Design & Installation - Terminal Ductwork Contractors - Private Finance Initiatives (PFI) free hit counter